1. Masterplan Design to fit your land and lifestyle
1 month
  • Model your land in 3D.
  • Meetings between you and our team to understand your goals and ideas
  • Working on the Masterplan Design
  • Deliverables: photo-realistic renders, conceptual floor-plans, quotation and construction time
  • If quotation is approved, we move forward with construction contract
2. Construction Plan Development
1 month

* We only go to this stage for projects with a signed contract and upfront payment.

  • Transition from schematic drawings to highly detailed dimensions, floorplan, interior sections, materials, and finishes
  • Develop the structural, mechanical, plumbing, and electrical system designs according to country regulations
  • Choosing of finishes
  • Material detail, material acquisitions, and importations
3. Get Permits and Approvals
1 to 3 months
  • There is no need to worry about paperwork. We take care of all permits to get the project ready to build. While approvals timelines can vary based on the type of project and location, we will do our best to break ground as soon as possible.
4. Prefab Production and Project Coordination
1 month
  • Here is where the magic happens. We build many parts of your LAR home in a prefab factory using assembly-line construction that cuts the time, waste, and headaches associated with building. Everything arrives pre-cut and ready to stall on the site.
  • The integration of technology and construction is less vulnerable to weather conditions or human mistakes. Factory tools offer additional quality assurance compared to traditional construction on-site and a controlled manufacturing environment follows specified standards, therefore built to a uniform quality.
5. Build your LAR Home
3 to 6 months

Our process is easy, clean, and fast, with no headaches or surprises during construction.

  • Our building system increases precision and reduces waste on site.
  • A dedicated civil engineer is always on site to ensure that everything goes according to plan.
  • The project architect provides support to the engineer through weekly meetings and site visits at no additional cost.
  • We provide a construction schedule with monthly updates that will keep you informed and ensure that the project stays on schedule.
6. Move into your LAR Home

Welcome home! It is time to enjoy.